
High-Power DC Fast Charger – 180 kW / 240 kW / 320 kW / 360 kW / 400 kW
SKU: ABG-EVC-HPDC-180400
High-power DC fast charging solution from 180 kW to 400 kW designed for rapid charging, commercial fleets and high-throughput EV infrastructure.
Overview
The ABG High-Power DC Fast Charger delivers rapid charging performance for demanding commercial and public infrastructure applications. Available from 180 kW to 400 kW, the system supports a wide DC output voltage range and dynamic power allocation. Designed with industrial-grade protection, intelligent connectivity and multiple connector configurations, it is suitable for high-throughput charging hubs, fleets and highway infrastructure. Key Features 180 / 240 / 320 / 360 / 400 kW options Wide 200V–1000V DC output Up to 350A per charging gun Dynamic power allocation Dual connector configurations Up to 96% efficiency 10.1-inch touchscreen Ethernet and optional 4G OCPP 1.6J OCPP 2.0 planned RFID / QR / optional Credit Card IP54 / IK10 protection Remote diagnostics and OTA capability
Technical Specifications
| Rated Power | 180 / 240 / 320 / 360 / 400 kW |
| Input Voltage | 400VAC ±10% |
| Input Frequency | 50/60Hz ±10% |
| AC Wiring | 3P+N+PE |
| Output Voltage | 200V–1000V DC |
| Max Current per Gun | 350A |
| Connector Options | CCS2+CCS2 / GB/T+GB/T / CCS2+GB/T |
| Display | 10.1-inch High-Brightness Touchscreen |
| Network | Ethernet / Optional 4G |
| Protocol | OCPP 1.6J |
| Cooling | Air Cooling |
| Protection | IP54 / IK10 |
| Certification | CE / TÜV |
| Cable | 5m Standard |
| Installation | Floor Standing |
| Operating Temperature | -25°C to +50°C |
| Material | Stainless Steel |
| Application | Highway Charging Stations | High-Traffic EV Hubs | Commercial Fleets | Bus Depots | Logistics Fleets | Public Charging Networks | Large Commercial Sites | EV Infrastructure Projects |
Technical buying guidance
Related buyer guides & requirements
DC Fast Charger Selection Guide
Match charger power, connector, communications and operating requirements to the intended site.
Read guideEV Charger Site Power Requirements
Validate sanctioned load, transformer capacity and simultaneous charging demand before deployment.
Read guideFleet Charging Infrastructure
Translate vehicle duty cycles, depot schedules and electrical constraints into the charging architecture.
Read guideTell Us About Your Charging / Energy Requirement
Share what you already know. You do not need to have every specification finalized before starting a technical discussion.